blob: 2769e13faed729dd5253d45772dd6f06f559ddcb (
plain) (
tree)
|
|
SPDX-License-Identifier: CC-BY-SA-4.0 OR BSD-2-Clause
copyrights:
- Copyright (C) 1988, 1998 On-Line Applications Research Corporation (OAR)
enabled-by: true
glossary-type: term
links:
- role: glossary-member
uid: ../glossary-general
term: transient overload
text: |
A temporary rise in system activity which may cause deadlines to be
missed. Rate Monotonic Scheduling can be used to determine if all
deadlines will be met under transient overload.
type: glossary
|