summaryrefslogtreecommitdiff
path: root/spec/glos/term/schedulable.yml
diff options
context:
space:
mode:
Diffstat (limited to '')
-rw-r--r--spec/glos/term/schedulable.yml (renamed from spec/glos/term/RTEMS-GLOS-TERM-SCHEDULABLE.yml)10
1 files changed, 2 insertions, 8 deletions
diff --git a/spec/glos/term/RTEMS-GLOS-TERM-SCHEDULABLE.yml b/spec/glos/term/schedulable.yml
index 6ddabb3e..3ec2201c 100644
--- a/spec/glos/term/RTEMS-GLOS-TERM-SCHEDULABLE.yml
+++ b/spec/glos/term/schedulable.yml
@@ -1,18 +1,12 @@
SPDX-License-Identifier: CC-BY-SA-4.0
-active: true
copyrights:
- Copyright (C) 1988, 1998 On-Line Applications Research Corporation (OAR)
-derived: false
enabled-by: []
glossary-term: schedulable
glossary-type: term
-header: ''
-level: 1.143
links:
-- RTEMS-GLOS-GENERAL: y-DGLwoqVNRBlzUau_mx_yR3iKlhE02h2mRxK7VkLQE=
-normative: true
-ref: ''
-reviewed: 4KpopzqZnHe-IPi0Y06MqKnjmNoymi_oQmYQ4fTf3BM=
+- role: null
+ uid: ../general
text: |
A set of tasks which can be guaranteed to meet their deadlines based upon
a specific scheduling algorithm.