summaryrefslogtreecommitdiffstats
path: root/eng
diff options
context:
space:
mode:
authorMatt Joyce <matthew.joyce@embedded-brains.de>2022-11-07 11:20:20 +0100
committerSebastian Huber <sebastian.huber@embedded-brains.de>2022-11-08 06:59:24 +0100
commitc881d1e7d80b0aacff7ef3f75af6c26d5236c366 (patch)
treeae589b28b3810bca496f1406cc16052a7c7ab65c /eng
parentbsp-howto: Specify name of clock driver init func (diff)
downloadrtems-docs-c881d1e7d80b0aacff7ef3f75af6c26d5236c366.tar.bz2
eng: Fix typos
Diffstat (limited to 'eng')
-rw-r--r--eng/prequalification.rst8
1 files changed, 4 insertions, 4 deletions
diff --git a/eng/prequalification.rst b/eng/prequalification.rst
index ba1840a..0dddb15 100644
--- a/eng/prequalification.rst
+++ b/eng/prequalification.rst
@@ -15,7 +15,7 @@ standards typically do not specify software functionality but address
topics like requirements definition, traceability, having a documented
change process, coding style, testing requirements, and a user's
manual. During system test, these standards call for a review - usually
-by an independent entity - that the standard has been adhered too. These
+by an independent entity - that the standard has been adhered to. These
reviews cover a broad variety of topics and activities, but the process
is generally referred to as qualification, verification, or auditing
against the specific standard in use. The RTEMS Project will use the
@@ -83,8 +83,8 @@ Stakeholder Involvement
Qualification of RTEMS is a specialized activity and only specific users
of RTEMS will complete a formal qualification activity. The RTEMS Project
-cannot self-fund this entire activity and requires stakeholder to invest
-in an ongoing basis to ensure that any investment they make is maintained
-and viable in an ongoing basis. The RTEMS core developers view steady
+cannot self-fund this entire activity and requires stakeholders to invest
+on an ongoing basis to ensure that any investment they make is maintained
+and viable in the long-term. The RTEMS core developers view steady
support of the qualification effort as necessary to continue to lower
the overall costs of qualifying RTEMS.